Similar in structure and delivery to Design-Assist, Vector’s CMAR delivery results in the establishment of Guaranteed Maximum Price (GMP) at the close of the Preconstruction Services phase.  Utilizing CMAR, we drive best value decision making by producing Opinion of Probable Construction Cost (OPCC) estimates from a specified point in the design process (typically 35 to 65% Construction Documents).

This effort results in the development of a GMP that sheds risk, incorporates best practices and provides cost and schedule certainty to owners.